Ankara İzmir HighSpeed Train Project

Location: Afyon/Turkey

Client: Turkish State Railway (TCDD)

Contract Type: Subcontractor - DOGUS-TEKFEN JV

Responsibility: Lumps Sum construction works for 25km part of 76km main High Speed Train LineTotal Line : 76 km

Construction Area: Infrastructure-High Speed Train

Project Status: Ongoing

Project Description: Construction Works (tunnel boring, concrete and earthworks) for Ankara – İzmir High Speed Train Project' at Afyonkarahisar-Uşak (Banaz) section. This massive project includes earth works, tunnel construction, concrete works and engineering structures. Scope of work for Alto Partners is not limited as follows; Earthworks: 7 000 000 m3 earthworks including 4 000 000 m3 excavation, 3 000 000 m3 filling, back filling, 150,000 m3 gravel fill Tunnel Construction: 1 560 m total tunnel length 50 000 m3 concrete works 4 000 ton steel supporting and bracing systems and reinforcement 150,000 m tunnel bulleting for reinforcement 100,000 m tunnel boring reinforcement The purpose of the project is to shorten transportation time between Ankara and İzmir significantly. Alto Partners operates as one of the main subcontractors to deliver the project on time with perfect safety record. The project is expected to be finished in 2019. Alto Partners is fully committed to deploy best engineering, procurement and construction practices in line with projects and contribute to completion of project on time.